St. Charles County Emergency Operations Center
Brinkmann handled the design-build construction for this facility focused on coordinated and efficient response 24/7
Brinkmann’s design-build team met critical safety requirements for the facility while staying one step ahead in the process.
The Emergency Operations Center is built to resist wind and impact forces from an F5 tornado. The facility also features redundant plumbing, HVAC, electrical, and communication services.
Brinkmann’s sequenced design-build process allowed the work to start earlier and stay one step ahead in the process. Site grading started before the foundations were designed, slabs were poured before wall panels were designed, and wall panels were erected before the interior and MEPS design was complete.
Realize Savings through Recessed Floor Redesign
Brinkmann worked with the structural engineer and concrete contractor to alter the building’s recessed floor design. With this adjustment, additional panels could be cast on the slab at one time, saving time and money.