Streets of St. Charles

BUILDING FOR WORK, LIVE, PLAY

Streets of St. Charles is a transformative 1.5 million square foot mixed-use development that creates a vibrant community destination combining shopping, living, modern offices, dining, hospitality, and entertainment amenities. This large-scale project showcases Brinkmann’s ability to deliver complex, multi-phase developments on aggressive timelines.

Location

St. Charles, MO

Size

1,500,000

Development Components

The comprehensive development includes multiple buildings and amenities:

  • Parking Infrastructure: 450,000 SF, 1,250-space garage ($13.5M)
  • Entertainment: 4,400 SF, eight-screen AMC movie theater ($11.4M)
  • Office Space: 128,000 SF office building – 1000 block ($8.3M)
  • Additional Office: 60,000 SF office building – 3000 block ($10.5M)
  • Residential Tower: 400,000 SF with 309 residential units ($36M)
  • Retail/Dining: 5,100 SF retail and restaurant space – 2000 block ($3.2M)
  • Multifamily Component: 245-unit residential building with premium amenities

Multifamily Building Features

The residential component includes sophisticated design elements:

  • Construction: Five stories of wood framing over partially below-grade concrete podium
  • Parking: Private, secured resident parking integrated into podium design
  • Luxury Amenities: Upscale outdoor amenity deck with pool, spa, lounge, and cooking spaces
  • Scenic Views: Amenity deck overlooks the Missouri River
  • Unit Mix: 245 one and two-bedroom units

Design Optimization & Value Engineering

Brinkmann’s comprehensive preconstruction services delivered significant value:

  • Design Evaluation: Analyzed multiple design options, structure types, and uses to optimize project budget
  • Creative Space Planning: Relocated mechanical spaces to basement area below parking deck
  • Cost Savings: Nearly $1 million saved by avoiding the need for an elevated parking deck
  • Parking Optimization: Achieved desired parking counts while maximizing cost efficiency

Project Delivery Excellence

Brinkmann delivered this complex mixed-use development on an aggressive timeline, allowing the owner to secure residents and collect revenue sooner than expected, demonstrating our expertise in large-scale, multi-phase project coordination and accelerated delivery schedules.

Testimonials

“The Brinkmann team approaches each project with a proactive and holistic view including but not limited to value engineering recommendations, identifying risks to minimize construction challenges, and scheduling impacts.”

Stephanie Webster
Senior VP of Development