Confidential Cold Storage Project
FOOD AUTOMATION THROUGH OPTIMIZED SOLUTIONS
This landmark project represents Brinkmann’s largest contract to date, positioning us at the forefront of the increasingly automated food distribution industry. The comprehensive development encompasses a significant expansion of this confidential client’s perishable distribution infrastructure, incorporating cutting-edge automation systems.
Location
Size
Project Scope
The ambitious development includes:
- 600,000-square-foot expansion to an existing perishable distribution center
- 40,000-square-foot truck maintenance facility
- Dedicated fuel island for fleet operations
- Fire pump house ensuring facility safety
- Security guard shack
- New office and maintenance areas
Operational Efficiency
The facility’s impressive 80-foot clear height accommodates advanced automation systems designed to streamline operations. This technology enables food products to move seamlessly through the system—from receiving to packaging to delivery preparation—enhancing the client’s distribution capabilities and store support.
Collaborative Problem-Solving
The project team has successfully navigated numerous challenges, including:
- Redesigning office spaces to meet evolving needs
- Maintaining uninterrupted operations during strategic demolition phases
- Resolving complex civil design issues
Through close collaboration with the client’s internal departments, our team continues to deliver optimized solutions for this sophisticated facility, ensuring it meets both current operational requirements and future growth potential.