Coastal Cold Storage

COLD STORAGE COLLABORATION

Brinkmann’s first cold storage distribution center for Coastal Carriers Truck Lines, LLC represents the initial phase of a three-part development strategically positioned less than a mile from Interstate 70. This specialized facility serves the unique needs of this Missouri-based transportation, warehouse and distribution company.

Location

Foristell, MO

Size

127,400

Facility Specifications

The comprehensive distribution center features:

  • 55,600-square-foot freezer with impressive 42-foot clear height
  • 23,500-square-foot cold dock spanning 70 feet deep
  • 29,300-square-foot cooler space
  • 15,500 total pallet positions
  • 8,600 square feet of administrative office space
  • 7,500 square feet dedicated to battery charging and maintenance

Site Amenities

The facility’s design accommodates robust logistics operations with:

  • 19 dock doors for efficient loading and unloading
  • 73 car parking spaces for employees and visitors
  • 28 trailer spaces for fleet management

Project Management Excellence

Despite challenging conditions that included 45 days of weather delays, the Brinkmann team successfully delivered this complex facility on schedule through strategic planning and close collaboration with both the site contractor and property owner.

Testimonials

“Brinkmann was our general contractor for the cold storage facility we recently completed, and I can confidently say their expertise and quality of work have exceeded our expectations. We saved millions compared to other proposals. The quality of craftsmanship, attention to detail, and expertise that the team has brought to the table are unmatched, and I highly recommend them as a trusted expert in this field.”

John Dunard
President